NEXT ROBOTTECHDATA CENTER EPC
AI Infrastructure & Data Center Construction

Data centersengineered for AI

We design and build data centers end to end — from site selection and grid capacity to engineering, construction, equipment supply, commissioning and the moment the first GPU cluster takes load.

10–100+
MW delivered capacity
Tier III / IV
Design & facility
150 kW
Per rack, liquid cooled
End-to-end
EPC single point of responsibility
SitePowerCoolingBuildingNetworkGPUTestingAI Infrastructure
SitePowerCoolingBuildingNetworkGPUTestingAI Infrastructure
Data center lifecycle

The whole project in one place

Seventeen stages, four phases, one contract. Select any stage to see what is actually done, what is installed and what you receive at the end of it.

01Development

Site Selection

Power first, land second. We screen candidate sites against grid capacity, fibre diversity, water, geology and permitting risk before a single line is drawn.

Duration2–6 weeks
Principal works
  • Grid capacity and connection queue study
  • Fibre route and carrier diversity survey
  • Geotechnical and flood risk screening
  • Climate, water and free-cooling potential
  • Logistics, access roads and heavy-lift routes
Equipment & tools
  • GIS and grid datasets
  • Survey and borehole rig
Stage result

Ranked site shortlist with power roadmap

Open the chapter
The whole chain

From land to compute.

Site, power, cooling, building, network, GPU, testing — one team holds the whole chain, and one contract holds the risk. That is the difference between a building and working infrastructure.

01

One point of responsibility

No gaps between design, supply and construction to argue about later.

02

Power-led engineering

The grid offer and the cooling choice drive the design, not the other way round.

03

Proven before handover

Integrated systems testing at full load, every failure mode demonstrated.

How we engage

Take as much of it as you need

Full turnkey responsibility, managed delivery against your own contracts, or a single package. The engineering team is the same either way.

EPC

01
Engineering · Procurement · Construction

One contract, one price, one programme, one point of responsibility for the delivered facility.

  • Lump sum turnkey
  • Performance guarantees
  • Single interface

EPCM

02
Engineering · Procurement · Management

You hold the contracts, we hold the programme — open-book cost control with our engineering and site management.

  • Open book
  • Client-held packages
  • Full site management

Design & Build

03
Concept to commissioning

A single team carries the design intent all the way into the built and tested facility.

  • Design responsibility
  • Early contractor involvement
  • Faster programme

Consulting

04
Technical advisory & due diligence

Owner’s engineer, lender’s technical advisor, design review, site screening and capacity strategy.

  • Owner’s engineer
  • Technical due diligence
  • Design audit

Equipment Supply

05
Sourcing, FAT, logistics

Long-lead electrical and mechanical packages sourced, tested and delivered to the site sequence.

  • Vendor management
  • Factory acceptance
  • Customs & haulage

Operations

06
O&M, monitoring, capacity

Contracted uptime with planned maintenance, 24/7 monitoring and a digital twin kept in sync.

  • SLA-backed uptime
  • Preventive maintenance
  • 24/7 NOC
Next step

Tell us what you are building

Send the site status, the grid offer and the target load. You get a concept, a power and cooling strategy and an indicative CAPEX back.

Start a project